The accommodation comprises the following areas
| Name | sq ft | sq m | Availability |
| Ground - Warehouse | 28,695 | 2,665.85 | Available |
| 1st | 6,346 | 589.56 | Available |
| Total | 35,041 | 3,255.41 |
Fronted by a regenerated canal and guarded by 24/7 on-site security, this prime West London site has unrivalled road, rail, and air links to unlock faster delivery times and new, growing customer bases. It’s proximity to Hayes town centre gives your people easy access to energising open space and all kinds of amenities. At Unit 3, progress comes naturally
Get directions from Google Maps
At SEGRO Park Hayes, careful consideration has been given to every aspect of this Grade A warehouse site – and the offices within. Each premium spec building is designed with growth in mind. Two dock-level and two level-access doors – plus high eaves with racking and mezzanine potential – mean the space will keep up with your development. Meanwhile, PV panels and EV charging points provide access to renewable energy at a lower cost. Built on the site of a 30-acre former Nestlé factory, SEGRO Park Hayes has been thoughtfully transformed to power smoother operations and sustainable growth. Now, only Unit 3 remains: the final available space in a highly sought after Park.