The accommodation comprises the following areas:
Name | sq ft | sq m | Availability |
Unit - Unit C | 98,436 | 9,145 | Available |
Unit - Unit D | 120,825 | 11,225.01 | Available |
Total | 219,261 | 20,370.01 |
Less than 2miles from J4 of the M65
M6/M61 approx 10minutes away
Get directions from Google Maps
To Let 2 New Industrial / Warehouse Units
Phase 2 Coming Soon – Available 2026
Unit C: 98,436 sq ft & Unit D: 120,825 sq ft
Full planning permission granted – D&B opportunities available
The units will benefit from the following specification:
Steel portal frame construction
Unit C: 7 Dock levellers & 1 eurodock leveller Unit D: 8 Dock levellers & 2 eurodock levellers
2 Level access doors
Unit C: Minimum 125 car parking spaces Unit D: Minimum 155 car parking spaces
Unit C: 12.5m eaves height Unit D: 15m eaves height 15M
500 KVA power supply to both units
Unit C: 55m yard depth Unit D: 50m yard depth
50Kn/m floor loading
BREEAM very good (targeted)
EPC A rating (targeted)