Summary

Property Type Office
Tenure To Let
Size 1,575 sq ft
Rent inclusive of furniture
Rates Payable £8.79 per sq ft based on 2023 valuation
Service Charge £6 per sq ft
EPC Rating This property has been graded as C (72)
  • Air conditioning
  • Suspended ceilings with LED lighting
  • Fully accessible raised floors
  • Parking ratio of 1:250 sq ft
  • CCTV and out-of-hours security
  • Café and nursery on-site

About

Ground floor furnished office suite available near Maidenhead on a flexible lease at a reduced rent.

Oakwood is a modern office building located on Grove Business Park, White Waltham. Set in attractively landscaped grounds, Grove Park provides a peaceful rural environment with spectacular views and excellent light as well as ample parking provision and a café and nursery on-site.

The Ground Floor office suite benefits from air conditioning, suspended ceilings with LED lighting, fully accessible raised floors, Cat V Cabling, kitchenette and male, female and accessible WC facilities. The office is furnished and available immediately.

Parking ratio 1:250 sq ft is included with the office suite and additional parking spaces may be available by way of a separate licence.

Oakwood, Grove Park Business Estate, Maidenhead, Office To Let - GP_Feb2023016.jpg

Accommodation

Namesq ftsq m
Ground - Suite 1,575 146.32
Total1,575146.32

Location

Grove Business Park is an established business park located on the edge of White Waltham, just outside of Maidenhead.

It is easily accessible from the A404M linking to both the M4 (junction 8/9) and the M40 (junction 4) both of which provide easy access to Heathrow Airport, Central London and the national motorway network via the M25.

Maidenhead benefits from a fast and frequent rail service to London Paddington with a fastest journey time of approximately 20 minutes.

Get directions from Google Maps

Oakwood, Grove Park Business Estate - GP_Feb2023015.jpg

Further Information

  • Terms

    A new lease is available direct from the Landlord on terms to be agreed. The Landlord will require a development break in December 2027