7,475 - 25,963 sq ft Industrial Warehouse Units in Neasden, NW10

 

Summary

  • To be refurbished
  • Directly Opposite Neasden Underground Station
  • 7.6m Eaves rising to 8.9m at the Apex
  • 3 Phase Power
  • Electric Roller Shutter Doors
  • Forecourt, parking and loading

Accommodation

Namesq ftsq mAvailability
Unit - 8 7,137 663.05 Available
Unit - 9 8,783 815.97 Available
Unit - 10 10,043 933.03 Available
Total25,9632,412.05
Falcon Park Industrial Estate, Units 8, 9 and 10 Falcon Park - Internal.jpg

Location

The established Falcon Park Industrial Estate is strategically located on Neasden Lane off the A406 North Circular road in the heart of North West London’s busy industrial area. The estate lies directly opposite Neasden Underground Station (Jubilee Line) whilst also offering strong bus links along Neasden Lane. The A406 North Circular road provides direct access to Junction 1 of the M1 motorway and the Hanger Lane gyratory system, enabling fast access into central London to the East and the national motorway network to the West.

Get directions from Google Maps

Further Information

Rent £25 per annum

Rates Payable VOA References: Units 8 and 9 - 30050052000815 | Unit 10 - 30050052001004

Service Charge n/a

EPC Rating This property has been graded as B


Description

The units form part of a terrace of industrial warehouse on the Falcon Park Industrial Estate in Neasden.
The units are of steel portal frame construction with brickwork and profile metal sheet clad elevations with a clear eaves height of approx. 7.6m rising to 8.9m at the apex. The units have separate pedestrian entrance at the front leading into a reception area with a W.C. which links
to the ground floor warehouse and first floor offices.

Benefits include:
• Frontage on to Neasden Lane opposite Neasden Underground Station
• Electric roller shutter doors
• 7.6m clear eaves height
• Air-conditioning
• 3 phase electricity & Gas
• Car parking
*Photos are for indicative purposes only at this stage.

Terms

The units are available on new leases directly from the landlord on terms to be agreed.
Refurbishment works are due to complete January 2025.